Key takeaway
Demolition should begin with information and planning, not machinery: structural condition, asbestos, utilities, neighbours, waste and the final site condition all need to be understood first.
TradeKind helps homeowners find local Sussex trades
Browse approved local trade profiles, compare nearby Sussex trades or post a job for free.
If you need a demolition contractor in Sussex, choose one who starts with surveys, structural information, services and site controls — not one whose first question is how quickly a machine can arrive.
Demolition is construction work in reverse.
The hazards do not disappear because the end result is an empty space.
Define exactly what is being demolished
Be clear whether the job is:
- shed/outbuilding;
- garage;
- extension;
- internal strip-out;
- partial structural demolition;
- whole building.
Also define what stays.
For partial demolition, mark:
- retained walls;
- retained roof areas;
- neighbouring structures;
- shared walls;
- services staying live.
A vague instruction to “take the back bit down” is not enough for structural work.
Structural information comes before sequence
HSE demolition guidance emphasises planning and structural stability.
Ask how the contractor determines:
- demolition sequence;
- temporary support;
- machinery position;
- exclusion zones;
- effect on retained structures.
Where engineering input is required, have it.
Do not ask a demolition crew to discover the building's structural logic while dismantling it.
Asbestos needs information before disturbance
Older buildings can contain asbestos in many products.
Before demolition or major intrusive refurbishment, appropriate asbestos information needs to be available.
If the building age/history means asbestos is possible, ask:
“What survey or asbestos information do you require before you price/start?”
Do not drill, smash or strip suspicious materials merely to help obtain a demolition quote.
If asbestos is identified, use the appropriate removal/control route for that material.
Services must be identified and made safe
Confirm the status of:
- gas;
- electricity;
- water;
- drainage;
- telecoms;
- solar/battery equipment if present.
A consumer-unit switch being off does not prove every external or buried service is disconnected.
Ask who arranges service disconnection/confirmation.
This matters before excavation as well as demolition.
Neighbours and boundaries affect the method
Demolition close to:
- party walls;
- neighbouring garages;
- shared access;
- public footpaths;
- roads;
needs additional planning.
The Party Wall etc. Act may also be relevant to certain adjoining work.
Do not leave neighbour notifications/access until machinery arrives.
For a tight urban site, logistics can be as important as demolition itself.
Ask about local-authority requirements
Demolition can trigger Building Act/local-authority notice processes and planning considerations depending on the work.
Ask the contractor what they expect to apply, but verify responsibility.
The owner should know:
- who submits required notices;
- what lead time applies;
- whether planning conditions exist;
- when work is permitted to start.
Waste is a major part of demolition
A building does not vanish.
It becomes:
- concrete;
- brick;
- timber;
- metal;
- plaster;
- insulation;
- glass;
- mixed waste.
Ask how waste is:
- segregated;
- loaded;
- transported;
- disposed/recovered.
The quote should identify major exclusions, especially hazardous material.
Dust, noise and public protection matter
Ask how the site will control:
- dust;
- flying debris;
- unauthorised access;
- vehicle movements;
- noise;
- public interfaces.
You do not need to write the contractor's safety plan.
You should expect evidence that the site is being treated as a controlled construction operation.
Define what “cleared site” means
At the end, are you expecting:
- slab retained;
- foundations removed;
- walls removed below ground;
- drainage capped;
- holes backfilled;
- levelled hardcore;
- topsoil;
- ready for a new build?
Write it down.
A demolition contractor may reasonably price only removal to ground level unless deeper work is specified.
Groundworks after demolition
If new construction follows immediately, coordinating groundworkers can make sense.
Ask whether:
- old foundations conflict with new ones;
- drainage is reused;
- excavation continues after demolition;
- temporary access is needed.
Sometimes one contractor handles both phases.
Sometimes separate specialists are clearer.
Landlords and property managers
For managed assets, retain:
- surveys;
- approvals/notices;
- asbestos records;
- service-disconnection evidence;
- waste records;
- before/after photos;
- final site record.
Demolition removes physical evidence. Your project file should preserve the important information.
Pre-demolition information is not optional admin
Demolition should begin with information about the structure and hazards, not with plant arriving on site.
For significant work, relevant information may include:
- structural form;
- previous alterations;
- asbestos information;
- live services;
- neighbouring structures;
- access;
- public interfaces.
HSE guidance treats demolition as construction work under CDM 2015 and emphasises competent planning.
For complex work, competent engineering input may be needed before the demolition method is finalised.
Check the local-authority demolition notice position
Demolition can require notice to the local authority before work starts.
For a full or substantial demolition, ask the contractor who is handling that process and what lead time applies.
Do not assume planning permission and demolition notice requirements are the same thing.
Also clarify:
- service disconnections;
- hoarding;
- dust/noise controls;
- road or pavement restrictions;
- neighbour protection.
The safest demolition quote is rarely the one with the fewest lines.
If you want to compare relevant Sussex businesses, start with demolition contractors.
Using TradeKind
You can browse demolition contractors across Sussex or post the project.
A useful brief might say:
“Demolish detached single-storey garage in Worthing. Approx. 6m x 3m, block construction with corrugated roof. Asbestos status not yet confirmed. Side access suitable for small plant. Remove slab and leave levelled hardcore for future garden room.”
That gives businesses the information they need without pretending unknowns are solved.
Before you choose
Confirm:
- structure/scope;
- structural planning;
- asbestos information;
- utilities;
- neighbour/public controls;
- notices/approvals;
- waste;
- access/machinery;
- final site condition;
- exclusions.
A professional demolition job is planned before anything is knocked down.
Frequently asked questions
How do I choose a demolition contractor?
Look for relevant demolition experience and a clear plan for structural information, services, asbestos, exclusion zones, neighbours, waste and what condition the site will be left in.
Do I need an asbestos survey before demolition?
Where asbestos could be present, suitable information must be available before work that could disturb it. For demolition or major refurbishment, this commonly requires an appropriate refurbishment/demolition asbestos survey carried out before work begins.
Do utilities need disconnecting before demolition?
Services such as gas, electricity, water and telecoms must be identified and made safe as required for the work. Do not assume switching something off inside the building is the same as a confirmed disconnection.
Does demolition need local-authority notice?
Some demolition is subject to Building Act/local-authority notice requirements and other approvals. The exact rules depend on the structure and project, so confirm the requirement before work starts.
Can I post a demolition job on TradeKind?
Yes. Include the structure type, approximate size, access, neighbours, known asbestos information, service status and what you want done with the cleared site.
Explore trades across Sussex
These are some of the main trades and Sussex areas you can browse on TradeKind. You can also explore many more trades, towns and villages across East Sussex and West Sussex, including Brighton & Hove.
Browse by trade
Can’t see what you need? Browse the full Sussex Trades Directory to explore more trades and areas.
Browse all trades and areasNeed a local Sussex trade?
TradeKind connects Sussex homeowners with local trades — free to use, with no hidden fees.