Key takeaway
Choose a kitchen renovator who controls the survey, service positions, appliance specifications and trade sequence before cabinets and worktops are ordered.
TradeKind helps homeowners find local Sussex trades
Browse approved local trade profiles, compare nearby Sussex trades or post a job for free.
If you are choosing a kitchen renovation specialist in Sussex, compare the quality of the survey and coordination of appliances, plumbing, electrics, gas and worktops before you compare the cabinet price.
A kitchen plan is only as reliable as its measurements and service positions. Lock down the room, appliance models and plumbing/electrical/gas routes before cabinets and worktops are ordered.
Kitchens are unforgiving of small assumptions. A socket in the wrong place, a fridge door that cannot open fully or a waste pipe behind the wrong cabinet can create expensive workarounds.
Start with a measured plan
A useful survey should record:
- wall lengths;
- ceiling height;
- doors/windows;
- reveals;
- floor level;
- boilers/meters;
- existing services;
- structural nibs/chimneys;
- awkward corners.
Do not order an entire kitchen from a sketch based on estate-agent dimensions.
Walls are rarely perfectly square.
Choose appliances before finalising cabinets
Confirm model dimensions for:
- fridge/freezer;
- oven;
- hob;
- extractor;
- dishwasher;
- washing machine;
- microwave;
- wine cooler if relevant.
Built-in appliance dimensions and ventilation clearances can affect cabinet choice.
A future “standard 600mm appliance” assumption is not enough for every product.
Services should follow the final layout
Agree where you need:
- hot/cold water;
- waste;
- gas if applicable;
- sockets;
- appliance supplies;
- lighting;
- extractor duct;
- data/controls.
Move services before cabinets hide the walls.
If the project includes work on gas appliances or fittings, HSE says it must be carried out by a Gas Safe registered engineer who is qualified for that specific work.
Electrical work should follow the relevant Building Regulations route; current GOV.UK guidance allows registered competent-person scheme installers to self-certify covered work.
Extraction should be designed, not improvised
Ask:
- recirculating or ducted?
- duct route;
- external outlet;
- cabinet/ceiling conflicts;
- noise;
- replacement air/ventilation implications where relevant.
A powerful extractor connected to a poor duct route may perform badly. Current Approved Document F guidance sets the ventilation framework for dwellings, so extraction should be designed as part of the room rather than treated as a cosmetic appliance choice.
If external ducting needs a new wall opening, confirm where it appears outside before the kitchen is installed.
Base units need to be level for the worktop
Worktops reveal installation errors.
Ask how the fitter handles:
- uneven floors;
- bowed walls;
- corners;
- end panels;
- appliance gaps.
For stone/composite tops, templating usually depends on finished, fixed and level units.
Confirm the template date and lead time before removing the old kitchen if the programme is tight.
Worktop details affect several trades
Decide:
- material;
- thickness;
- upstands/splashbacks;
- sink type;
- drainer grooves;
- hob cut-out;
- sockets in upstands;
- overhangs.
An undermount sink or flush hob cannot be decided casually after templating.
Lighting deserves a plan
A kitchen may need:
- general ceiling lighting;
- task lighting;
- under-cabinet lighting;
- pendant lighting;
- feature lighting.
Mark switches and circuits on the plan.
Do not discover after plastering that the under-cabinet transformer or cable has nowhere to go.
Structural changes are a separate scope
Removing a wall or enlarging an opening is not standard kitchen fitting.
If the renovation includes structural work, ask who provides:
- design;
- calculations where required;
- Building Regulations route;
- temporary support;
- making good.
A kitchen fitter may be ideal for replacement cabinets but not necessarily the person to manage a structural alteration.
Flooring sequence depends on the product
Ask whether flooring goes:
- before cabinets;
- after cabinets;
- beneath appliances;
- under islands.
The answer depends on flooring type, kitchen design and manufacturer requirements.
Agree it before the floor fitter and kitchen fitter arrive.
Landlords: design for replacement
For rental property, record:
- cabinet range/colour;
- door code;
- worktop product;
- handles;
- appliance models;
- paint colour;
- tile details.
Choose components that can be replaced without dismantling half the kitchen.
Accessible isolation valves and removable plinths make future maintenance easier.
Compare renovation quotes by stage
A complete quote may include:
- strip-out;
- disposal;
- services;
- plastering;
- electrical work;
- plumbing/gas;
- cabinets;
- fitting;
- worktops;
- appliances;
- splashback/tiling;
- flooring;
- decoration;
- certification;
- final clean.
A cabinet-install price is not comparable with a full renovation package.
Give renovators the information that changes the sequence
You can browse kitchen-renovation specialists across Sussex or post the project.
A useful brief might say:
“3.6m x 3.2m kitchen in Haywards Heath. Keep sink wall but move hob to opposite wall, new induction hob/oven, ducted extractor and quartz worktop. Units not ordered. Need survey, electrics/plumbing coordination, installation and decoration.”
That gives specialists enough to identify the real sequence.
Final checks before the old kitchen comes out
Confirm:
- measured plan;
- appliance models;
- services;
- extraction;
- electrical scope;
- worktop;
- floor sequence;
- structural changes;
- supply responsibility;
- programme;
- certification;
- final handover.
A kitchen is assembled from millimetres and sequence. Solve both before the boxes arrive.
Those checks help you choose the business that can coordinate the whole installation rather than simply fit the visible cabinets.
Frequently asked questions
What should be decided before ordering a new kitchen?
Confirm the measured room, cabinet layout, appliance models, sink/tap, worktop thickness, service positions, ventilation and who supplies each item before ordering wherever possible.
Do kitchen renovations need Building Regulations approval?
Some parts can. Electrical work, structural alterations, drainage and other changes may fall within Building Regulations. The exact route depends on the work being carried out.
When should the worktop be templated?
For made-to-measure stone or composite worktops, templating normally happens after base units are fixed and level and the relevant appliance/sink details are confirmed. Ask the supplier for their exact prerequisites.
Who coordinates the electrician, plumber and kitchen fitter?
Either the renovation contractor can manage the sequence or you can appoint trades separately. What matters is that one person owns the programme and everyone is working to the same final layout.
Can I post a kitchen renovation on TradeKind?
Yes. Include room dimensions, current layout, proposed changes, appliance list, worktop preference, supply plans, photos and your Sussex location.
Explore trades across Sussex
These are some of the main trades and Sussex areas you can browse on TradeKind. You can also explore many more trades, towns and villages across East Sussex and West Sussex, including Brighton & Hove.
Browse by trade
Can’t see what you need? Browse the full Sussex Trades Directory to explore more trades and areas.
Browse all trades and areasNeed a local Sussex trade?
TradeKind connects Sussex homeowners with local trades — free to use, with no hidden fees.

